Building a Post Frame Home | Underground Plumbing | Remington | Ep 9

This is episode 9 of the Remington post frame home build. The Remington is a 1600 sq ft custom post frame home on a continuous ICF foundation. During this episode we discuss the details of underground plumbing.

Remington Build Playlist

0:00 Intro
1:12 The Details
6:59 Marking Fixture Locations
7:48 Trenching
8:47 1st Bath
13:03 Main Waste
14:49 Master Bath
20:05 Water Lines
25:18 Review

Patreon โ€“ Build Your Dream
https://patreon.com/mrpostframe

Website
https://MRPostFrame.com

Search Our Website By Project or Room
MRPostFrame.com

Amazon Store | Project Tools Listed by Category
www.amazon.com/shop/marshallremodel

Finishes, Fixtures, Decor, + More
https://www.liketoknow.it/marshallremodel

Daily Updates
https://linktr.ee/marshallremodel

Mad County Build Series 100+ Videos

Thanks for stopping by our channel! We are self building our family of 5 a post frame barndominium in Iowa along with the life weโ€™ve always dreamed of.

The goal of our channel is to inspire others to build their dream by providing education on construction and an in depth look at how weโ€™ve gotten to this place.

Email:
Info@marshallremodel.com

Mailing:
PO Box 11
Winterset, IA 50273

#postframe #selfbuild #construction

You May Also Like