This is episode 9 of the Remington post frame home build. The Remington is a 1600 sq ft custom post frame home on a continuous ICF foundation. During this episode we discuss the details of underground plumbing.
Remington Build Playlist
0:00 Intro
1:12 The Details
6:59 Marking Fixture Locations
7:48 Trenching
8:47 1st Bath
13:03 Main Waste
14:49 Master Bath
20:05 Water Lines
25:18 Review
Patreon โ Build Your Dream
https://patreon.com/mrpostframe
Website
https://MRPostFrame.com
Search Our Website By Project or Room
MRPostFrame.com
Amazon Store | Project Tools Listed by Category
www.amazon.com/shop/marshallremodel
Finishes, Fixtures, Decor, + More
https://www.liketoknow.it/marshallremodel
Daily Updates
https://linktr.ee/marshallremodel
Mad County Build Series 100+ Videos
Thanks for stopping by our channel! We are self building our family of 5 a post frame barndominium in Iowa along with the life weโve always dreamed of.
The goal of our channel is to inspire others to build their dream by providing education on construction and an in depth look at how weโve gotten to this place.
Email:
Info@marshallremodel.com
Mailing:
PO Box 11
Winterset, IA 50273
#postframe #selfbuild #construction